Forklifts of Minnesota Bloomington, Minnesota
623 miles away
Overview
Shipping/Freight
Spec Sheet

2015 LP Gas Clark CGC70 - $63,750.00 Cushion Tire 4 Wheel Sit Down (Indoor Warehouse)

Call for price
Contact Information
CONTACT :
Jake Schubert
PHONE :
FAX :
Stock #:
U10264
YEAR:
2015
Manufacturer:
CAPACITY:
15500
FUEL:
LP Gas
MAST HEIGHT:
150 in
SIDE SHIFTER:
Yes
LOCATION:
DESCRIPTION:
Sideshifting Fork-Positioner
Equipment Description:

  • Model: Clark CGC70
  • Price: $63,750.00
  • Engine Specifications:
    • Engine Type: Internal Combustion
    • Fuel Type: LPG/Gasoline
    • Engine Manufacturer: Nissan
    • Power Output: 105 HP
  • Capacity:
    • Load Capacity: 15,500 lbs
  • Dimensions:
    • Overall Length: 139 inches
    • Overall Width: 59 inches
    • Overall Height: 89 inches
    • Wheelbase: 85 inches
  • Mast Specifications:
    • Mast Type: 2-Stage
    • Lift Height: 110 inches
    • Lowered Height: 89 inches
  • Tires:
    • Tire Type: Pneumatic
    • Front Tires: 300-15
    • Rear Tires: 750-15
  • Transmission:
    • Transmission Type: Powershift
  • Brakes:
    • Brake Type: Drum
  • Hydraulic System:
    • Hydraulic Flow: 18 GPM
  • Fuel Capacity:
    • Fuel Tank Capacity: 55 liters
  • Additional Features:
    • Steering: Power Steering
    • Operator Cab: Open / optional enclosed cab
    • Seat: Adjustable

Your location is Columbus, OH. Modify

Call
Get Quote
Equipment Finder Equipment
finder
*Payment stated above assumes a secured commercial loan transaction available to highly qualified applicants. Commercial financing provided or arranged by Strada Capital Corporation dba Mazo Capital Solutions pursuant to California Finance Lender License #603G255. Equal opportunity lender. Not all applicants will qualify. Applicant credit profile including FICO is used for credit review. Actual terms available may vary depending on applicant and/or guarantor credit profile(s), equipment type and additional approval conditions. Older assets or more may require increased finance charges. Financing approval will require pledge of collateral as security.
Please correct the following