Overview
Shipping/Freight
Spec Sheet

2017 LP Gas Doosan GC50C-5 Cushion Tire 4 Wheel Sit Down (Indoor Warehouse)

$18,599 USD
Stock #:
105035-24
YEAR:
2017
Manufacturer:
MODEL #:
CAPACITY:
10000
FUEL:
LP Gas
MAST TYPE:
Two Stage
MAST HEIGHT:
110 / 148 in
SIDE SHIFTER:
Yes
CONDITION:
Used
HOUR METER:
4477
LOCATION:
DESCRIPTION:
Full Factory Reconditioned! Low Hours!
Equipment Description:

  • Engine Specifications
    • Engine Model: PSI 4.3L V6
    • Engine Type: LPG Fuel System
    • Displacement: 4.3 liters
    • Horsepower: Approximately 96 HP
  • Dimensions
    • Overall Length (without forks): 122.8 inches
    • Overall Width: 54.9 inches
    • Height to Top of Overhead Guard: 85.8 inches
  • Load Handling
    • Load Capacity: 5,000 kg (11,023 lbs)
    • Load Center: 24 inches
    • Mast Options: Various mast options available
  • Performance
    • Travel Speed (Loaded): 12.4 mph
    • Lift Speed (Loaded): 118 feet per minute
    • Lowering Speed (Loaded): 98 feet per minute
  • Tire Specifications
    • Tire Type: Pneumatic
    • Front Tire Size: 8.25-15-14PR
    • Rear Tire Size: 7.00-12-12PR
  • Braking System
    • Service Brake: Hydraulic
    • Parking Brake: Mechanical Lever Type
  • Hydraulic System
    • Pump Type: Gear Type
    • Hydraulic Pressure: 2,650 psi
  • Operator Comfort
    • Adjustable Steering Wheel: Yes
    • Suspension Seat: Standard
    • Cabin Options: Enclosed cabin options available

Your location is Columbus, OH. Modify

Call
Get Quote
Equipment Finder Equipment
finder
*Payment stated above assumes a secured commercial loan transaction available to highly qualified applicants. Commercial financing provided or arranged by Strada Capital Corporation dba Mazo Capital Solutions pursuant to California Finance Lender License #603G255. Equal opportunity lender. Not all applicants will qualify. Applicant credit profile including FICO is used for credit review. Actual terms available may vary depending on applicant and/or guarantor credit profile(s), equipment type and additional approval conditions. Older assets or more may require increased finance charges. Financing approval will require pledge of collateral as security.
Please correct the following