Towlift Inc. Oakland, California
2102 miles away
Overview
Shipping/Freight
Spec Sheet

2018 LP Gas Doosan GC25P-5 Cushion Tire 4 Wheel Sit Down (Indoor Warehouse)

$17,500 USD
Contact Information
Towlift Inc.
4701 Oakport Street
Oakland, California 94601
CONTACT :
Cody Anderson
PHONE :
Stock #:
7967-20
YEAR:
2018
Manufacturer:
MODEL #:
CAPACITY:
5000
FUEL:
LP Gas
MAST TYPE:
Three Stage
MAST HEIGHT:
84 / 189 in
SIDE SHIFTER:
Yes
CONDITION:
Used
HOUR METER:
4410
LOCATION:
Equipment Description:

  • Engine
    • Model: PSI 2.4L
    • Type: LPG
    • Output: 49.2 kW (66 HP) at 2,700 rpm
    • Torque: 177 Nm at 1,800 rpm
  • Dimensions
    • Overall Length: 3,628 mm (with forks)
    • Overall Width: 1,150 mm
    • Height to Top of Overhead Guard: 2,189 mm
    • Wheelbase: 1,600 mm
  • Performance
    • Rated Capacity: 2,500 kg
    • Load Center: 500 mm
    • Max Travel Speed: 18.0 km/h with/without load
    • Lift Speed: 580 mm/sec with load / 600 mm/sec without load
  • Tires
    • Front: 7.00-12-12PR
    • Rear: 6.00-9-10PR
  • Brakes
    • Service Brake: Hydraulic, Foot Pedal
    • Parking Brake: Mechanical, Hand Lever
  • Steering
    • Type: Hydrostatic Power Steering
    • Steering Angle: 90° each side
  • Transmission
    • Type: Powershift
    • Stages: 1 Forward, 1 Reverse
  • Additional Specifications
    • Fuel Tank Capacity: 33 L
    • Hydraulic Tank Capacity: 75 L
    • Turning Radius: 2,278 mm

Your location is Columbus, OH. Modify

Call
Get Quote
Equipment Finder Equipment
finder
*Payment stated above assumes a secured commercial loan transaction available to highly qualified applicants. Commercial financing provided or arranged by Strada Capital Corporation dba Mazo Capital Solutions pursuant to California Finance Lender License #603G255. Equal opportunity lender. Not all applicants will qualify. Applicant credit profile including FICO is used for credit review. Actual terms available may vary depending on applicant and/or guarantor credit profile(s), equipment type and additional approval conditions. Older assets or more may require increased finance charges. Financing approval will require pledge of collateral as security.
Please correct the following