Welch Equipment Company Inc Denver, Colorado
1157 miles away
Overview
Shipping/Freight
Spec Sheet

2004 LP Gas Toyota 7FGU25 Pneumatic Tire 4 Wheel Sit Down

Call for price
Contact Information
CONTACT :
Keith Fine
PHONE :
FAX :
Stock #:
371080
YEAR:
2004
Manufacturer:
MODEL #:
CAPACITY:
5000
FUEL:
LP Gas
MAST HEIGHT:
89 / 189 in
SERIAL #:
73182
SIDE SHIFTER:
No
CONDITION:
Used
HOUR METER:
5907
LOCATION:
DESCRIPTION:
3 way valve
Equipment Description:

  • General Specifications
    • Model: 7FGU25
    • Manufacturer: Toyota
    • Type: Internal Combustion Forklift
  • Engine
    • Engine Model: Toyota 4Y
    • Fuel Type: LPG (Liquefied Petroleum Gas)
    • Displacement: 2.2 liters
  • Performance
    • Load Capacity: 5,000 lbs
    • Max Travel Speed: Approximately 10.9 mph (unloaded)
    • Lifting Speed: Approximately 120/130 ft/min (unloaded/loaded)
  • Dimensions
    • Overall Length (to fork face): Approximately 104.3 inches
    • Overall Width: Approximately 45.9 inches
    • Overall Height with Overhead Guard: Approximately 83.5 inches
    • Wheelbase: Approximately 66.9 inches
  • Operational Features
    • Steering: Hydrostatic Power Steering
    • Brakes: Hydraulic Drum Brakes
    • Transmission: Powershift
    • Tires: Pneumatic
  • Mast Options
    • Mast Type: 2-stage or 3-stage (varies by model)
    • Max Fork Height: 189 inches (varies with mast type)
  • Weight
    • Approximate Total Weight: 8,500 lbs

Your location is Columbus, OH. Modify

Call
Get Quote
Equipment Finder Equipment
finder
*Payment stated above assumes a secured commercial loan transaction available to highly qualified applicants. Commercial financing provided or arranged by Strada Capital Corporation dba Mazo Capital Solutions pursuant to California Finance Lender License #603G255. Equal opportunity lender. Not all applicants will qualify. Applicant credit profile including FICO is used for credit review. Actual terms available may vary depending on applicant and/or guarantor credit profile(s), equipment type and additional approval conditions. Older assets or more may require increased finance charges. Financing approval will require pledge of collateral as security.
Please correct the following