C & B Material Handling LLC Sioux Falls, South Dakota
749 miles away
Overview
Shipping/Freight
Spec Sheet

Electric Doosan BC20SC-5 Electric 3 Wheel Sit Down

Call for priceNew
Contact Information
CONTACT :
Sales Dept.
PHONE :
FAX :
Stock #:
316073
Manufacturer:
MODEL #:
FUEL:
Electric
CONDITION:
New
HOUR METER:
2
DESCRIPTION:
Equipment Description:

  • General Specifications
    • Model: BC20SC-5
    • Manufactured by: Doosan
    • Type: Electric Counterbalance Forklift
  • Performance
    • Load Capacity: 4,000 lbs (1814 kg)
    • Load Center: 24 inches (600 mm)
    • Travel Speed (Loaded/Unloaded): 10.6 mph (17 km/h)
    • Lifting Speed (Loaded/Unloaded): 63/98 feet per minute (19/30 m/min)
    • Gradeability (Loaded): 16%
  • Dimensions
    • Overall Length (without forks): 92.3 inches (2345 mm)
    • Overall Width: 42.1 inches (1070 mm)
    • Height to Top of Overhead Guard: 83.5 inches (2120 mm)
    • Turning Radius: 77.2 inches (1962 mm)
  • Power System
    • Battery Voltage: 48V
    • Battery Capacity: 420 Ah
    • Motor Type (Drive/Lift): AC Electric
  • Tires
    • Type: Cushion
    • Tire Size (Front/Rear): 18x7-8 / 15x4½-8
  • Hydraulic System
    • Hydraulic Pressure: 2,998 psi (206 bar)
    • Auxiliary Hydraulic Flow: 11.4 gallons per minute (43 L/min)
  • Additional Features
    • Ergonomic Operator Compartment
    • Safety Features
    • Advanced Control Systems
    • Multi-function Display

Your location is Columbus, OH. Modify

Call
Get Quote
Equipment Finder Equipment
finder
*Payment stated above assumes a secured commercial loan transaction available to highly qualified applicants. Commercial financing provided or arranged by Strada Capital Corporation dba Mazo Capital Solutions pursuant to California Finance Lender License #603G255. Equal opportunity lender. Not all applicants will qualify. Applicant credit profile including FICO is used for credit review. Actual terms available may vary depending on applicant and/or guarantor credit profile(s), equipment type and additional approval conditions. Older assets or more may require increased finance charges. Financing approval will require pledge of collateral as security.
Please correct the following