ProLift Toyota Material Handling Louisville, Kentucky
184 miles away
Overview
Shipping/Freight
Spec Sheet

2013 Electric Karcher KM 120/150 R LPG 2SB Rider Sweepers

Call for price
Contact Information
CONTACT :
Jessica Conrad
PHONE :
Stock #:
YEAR:
2013
Manufacturer:
SUBCATEGORY:
FUEL:
Electric
SERIAL #:
15112070010026
CONDITION:
Used
HOUR METER:
142
LOCATION:
Equipment Description:

  • Karcher KM 120/150 R LPG 2SB Specifications
  • General Information
    • Model: KM 120/150 R LPG 2SB
    • Product Type: Industrial Sweeper
    • Manufacturer: Karcher
    • Power Source: LPG
  • Performance
    • Main Operating Range: Indoor and Outdoor
    • Circular Brush Diameter: Standard
    • Hourly Coverage: Approx. 8800 m²/hour
    • Forward Speed: Adjustable
  • Dimensions
    • Length: 2000 mm
    • Width: 1600 mm
    • Height: 1450 mm
    • Weight: Approx. 1100 kg
  • Engine
    • Type: Robust LPG Engine
    • Power Output: Varied depending on load
  • Tank Capacity
    • Fuel Tank Capacity: Suitable for extended use
    • Waste Container Volume: 150 liters
  • Operational Features
    • Ease of Use: Simple one-button operation
    • Steering: User-friendly control
    • Filtration: Efficient dust control system
  • Safety and Convenience
    • Light Indicator: For maintenance notifications
    • Safety Features: Integrated for safe operation

Your location is Columbus, OH. Modify

Call
Get Quote
Equipment Finder Equipment
finder
*Payment stated above assumes a secured commercial loan transaction available to highly qualified applicants. Commercial financing provided or arranged by Strada Capital Corporation dba Mazo Capital Solutions pursuant to California Finance Lender License #603G255. Equal opportunity lender. Not all applicants will qualify. Applicant credit profile including FICO is used for credit review. Actual terms available may vary depending on applicant and/or guarantor credit profile(s), equipment type and additional approval conditions. Older assets or more may require increased finance charges. Financing approval will require pledge of collateral as security.
Please correct the following