Select Equipment Sales Buena Park, California
1970 miles away
Overview
Shipping/Freight
Spec Sheet

2013 Electric Toyota 8FBCU25 Cushion Tire 4 Wheel Sit Down (Indoor Warehouse)

Call for price
Contact Information
CONTACT :
Sales Dept.
PHONE :
FAX :
Stock #:
U190602
YEAR:
2013
Manufacturer:
MODEL #:
CAPACITY:
5000
FUEL:
Electric
MAST TYPE:
Quad Mast
MAST HEIGHT:
240 in
SIDE SHIFTER:
Yes
CONDITION:
Used
HOUR METER:
3200
LOCATION:
DESCRIPTION:
Side-Shift, 3200 Hours, Retail Ready
Equipment Description:

  • General Information
    • Model: Toyota 8FBCU25
    • Type: Electric Counterbalance Forklift
    • Power: Electric
  • Capacity and Dimensions
    • Load Capacity: 5,000 lbs
    • Wheelbase: 55 inches
    • Overall Length: 107 inches
    • Overall Width: 42 inches
    • Overall Height (with overhead guard): 88 inches
  • Performance
    • Travel Speed (laden/unladen): 10.6 mph
    • Lift Speed (laden/unladen): 100 ft/min
    • Gradeability (laden/unladen): 15%
  • Electrical System
    • Voltage: 48V
    • Battery Capacity: Typically depends on battery provider
  • Hydraulic System
    • System Pressure: Standard pressure setting according to manufacturer's specifications
  • Tires
    • Tire Type: Cushion
    • Front Tire Size: 18 x 7-8
    • Rear Tire Size: 16 x 5-8
  • Additional Features
    • Operator Presence Sensing System
    • AC Power System
    • Active Mast Control
    • Electronic Speed Control

Your location is Columbus, OH. Modify

Call
Get Quote
Equipment Finder Equipment
finder
*Payment stated above assumes a secured commercial loan transaction available to highly qualified applicants. Commercial financing provided or arranged by Strada Capital Corporation dba Mazo Capital Solutions pursuant to California Finance Lender License #603G255. Equal opportunity lender. Not all applicants will qualify. Applicant credit profile including FICO is used for credit review. Actual terms available may vary depending on applicant and/or guarantor credit profile(s), equipment type and additional approval conditions. Older assets or more may require increased finance charges. Financing approval will require pledge of collateral as security.
Please correct the following